ANALISA SNI














D A F T A R A N A L I S A P E K E R J A A N E D I S I 2 0 0 9














SUMBER DATA
: PASARAN BEBAS








PERIODE
: SEPTEMBER - DESEMBER 2009









































HARGA BAHAN/ UPAH JUMLAH
NO SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN BAHAN HARGA HARGA KET.








Rp (Rp)*1,1 Rp (Rp)*1,1
1 2 3 4 5 6 7 8 9 10 11













I 03-2835-2002 6

PEKERJAAN PERSIAPAN




















6,1 1,000 m' Pagar Sementara dari Kayu Tinggi 2 m

138.110,00 151.921,00





Bahan



120.610,00 132.671,00



1,250 Btg Kayu Dolken diameter 8 - 10 /400 cm 35.200,00 38.720,00 44.000,00 48.400,00



2,500 Kg Portland Cement

1.020,00 1.122,00 2.550,00 2.805,00



0,005 m3 Pasir Beton

120.000,00 132.000,00 600,00 660,00



0,009 m3 Koral Beton

120.000,00 132.000,00 1.080,00 1.188,00



0,014 m3 Kayu 5/7 Kruing

5.060.000,00 5.566.000,00 70.840,00 77.924,00



0,060 Kg Paku Biasa 2" - 5"
16.000,00 17.600,00 960,00 1.056,00



0,400 Lt Residu

1.450,00 1.595,00 580,00 638,00















6.1.2

Tenaga



17.500,00 19.250,00



0,200 OH Tukang Kayu

35.000,00 38.500,00 7.000,00 7.700,00



0,400 OH Pekerja

22.500,00 24.750,00 9.000,00 9.900,00



0,020 OH Kepala Tukang

37.500,00 41.250,00 750,00 825,00



0,020 OH Mandor

37.500,00 41.250,00 750,00 825,00















6,2 1,000 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

203.530,00 223.883,00


6.2.1

Bahan



186.030,00 204.633,00



1,250 Btg Kayu Dolken diameter 8 - 10 / 400 cm 35.200,00 38.720,00 44.000,00 48.400,00



2,500 Kg Portland Cement

1.020,00 1.122,00 2.550,00 2.805,00



1,200 Lbr Seng Gelombang 3" - 5"
49.000,00 53.900,00 58.800,00 64.680,00



0,005 m3 Pasir Beton

120.000,00 132.000,00 600,00 660,00



0,009 m3 Koral Beton

120.000,00 132.000,00 1.080,00 1.188,00



0,014 m3 Kayu 5/7X4m Kayu Kruing
5.060.000,00 5.566.000,00 70.840,00 77.924,00



0,060 Kg Paku Biasa 2" - 5"
16.000,00 17.600,00 960,00 1.056,00



0,450 Kg Meni Besi

16.000,00 17.600,00 7.200,00 7.920,00















6.2.2

Tenaga



17.500,00 19.250,00



0,200 OH Tukang Kayu

35.000,00 38.500,00 7.000,00 7.700,00



0,400 OH Pekerja

22.500,00 24.750,00 9.000,00 9.900,00



0,020 OH Kepala Tukang

37.500,00 41.250,00 750,00 825,00



0,020 OH Mandor

37.500,00 41.250,00 750,00 825,00















6,3 1,000 m' Pagar Sementara dari Kawat Berduri Tinggi 1,80 m

1.917.630,00 2.109.393,00


6.3.1

Bahan



1.902.380,00 2.092.618,00



1,000 Btg Kayu Dolken diameter 8 - 10 / 400 cm 35.200,00 38.720,00 35.200,00 38.720,00



2,000 Kg Portland Cement

1.020,00 1.122,00 2.040,00 2.244,00



25,000 Kg Kawat Duri

74.500,00 81.950,00 1.862.500,00 2.048.750,00



0,005 m3 Pasir Beton

120.000,00 132.000,00 600,00 660,00



0,009 m3 Koral Beton

120.000,00 132.000,00 1.080,00 1.188,00



0,060 Kg Paku Biasa 2" - 5"
16.000,00 17.600,00 960,00 1.056,00















6.3.2

Tenaga



15.250,00 16.775,00



0,200 OH Tukang Kayu

35.000,00 38.500,00 7.000,00 7.700,00



0,300 OH Pekerja

22.500,00 24.750,00 6.750,00 7.425,00



0,020 OH Kepala Tukang

37.500,00 41.250,00 750,00 825,00



0,020 OH Mandor

37.500,00 41.250,00 750,00 825,00















6,4 1,000 m' Pengukuran dan Pemasangan Bouwplank

107.777,50 118.555,25


6.4.1

Bahan



101.465,00 111.611,50



0,012 m3 Kayu 5/7x 4m Kayu Kruing
5.060.000,00 5.566.000,00 60.720,00 66.792,00



0,020 Kg Paku Biasa 2" - 5"
16.000,00 17.600,00 320,00 352,00



0,007 m3 Kayu Papan 3/20 Kruing
5.775.000,00 6.352.500,00 40.425,00 44.467,50















6.4.2

Tenaga



6.312,50 6.943,75



0,100 OH Tukang Kayu

35.000,00 38.500,00 3.500,00 3.850,00



0,100 OH Pekerja

22.500,00 24.750,00 2.250,00 2.475,00



0,010 OH Kepala Tukang

37.500,00 41.250,00 375,00 412,50



0,005 OH Mandor

37.500,00 41.250,00 187,50 206,25















6,5 1,000 m2 Pembuatan Kantor Sementara dg Lantai Plesteran

748.722,00 823.594,20


6.5.1

Bahan



585.597,00 644.156,70



1,250 Btg Kayu Dolken diameter 8 - 10 / 400 cm 35.200,00 38.720,00 44.000,00 48.400,00



0,180 m3 Kayu Putih

1.210.000,00 1.331.000,00 217.800,00 239.580,00



0,850 Kg Paku Biasa 2" - 5"
16.000,00 17.600,00 13.600,00 14.960,00



1,100 Kg Besi Strip

15.000,00 16.500,00 16.500,00 18.150,00



35,000 Kg Portland Sement

1.020,00 1.122,00 35.700,00 39.270,00



0,150 m3 Pasir pasang

90.000,00 99.000,00 13.500,00 14.850,00



0,100 m3 Pasir Beton

120.000,00 132.000,00 12.000,00 13.200,00



0,150 m3 Koral Beton

120.000,00 132.000,00 18.000,00 19.800,00



30,000 buah Batu bata Merah

350,00 385,00 10.500,00 11.550,00



0,250 Lbr Seng Plat

42.500,00 46.750,00 10.625,00 11.687,50



2,000 buah Jendela Naco

87.500,00 96.250,00 175.000,00 192.500,00



0,080 m2 Kaca Polos

41.400,00 45.540,00 3.312,00 3.643,20



0,150 buah Kunci Tanam

60.000,00 66.000,00 9.000,00 9.900,00



0,300 buah Engsel

10.000,00 11.000,00 3.000,00 3.300,00



0,060 Lbr Plywood 4 mm

51.000,00 56.100,00 3.060,00 3.366,00















6.5.2

Tenaga



163.125,00 179.437,50



2,000 OH Tukang Kayu

35.000,00 38.500,00 70.000,00 77.000,00



1,000 OH Tukang Batu

35.000,00 38.500,00 35.000,00 38.500,00



2,000 OH Pekerja

22.500,00 24.750,00 45.000,00 49.500,00



0,300 OH Kepala Tukang

37.500,00 41.250,00 11.250,00 12.375,00



0,050 OH Mandor

37.500,00 41.250,00 1.875,00 2.062,50















6,6 1,000 m2 Pembuatan Gudang Semen dan Alat-alat

536.175,00 589.792,50


6.6.1

Bahan



434.300,00 477.730,00



1,700 Btg Kayu Dolken diameter 8 - 10 / 400 cm 35.200,00 38.720,00 59.840,00 65.824,00



0,210 m3 Kayu

1.210.000,00 1.331.000,00 254.100,00 279.510,00



0,300 Kg Paku Biasa 2" - 5"
16.000,00 17.600,00 4.800,00 5.280,00



10,500 Kg Portland Cement

1.020,00 1.122,00 10.710,00 11.781,00



0,030 m3 Pasir Beton

120.000,00 132.000,00 3.600,00 3.960,00



0,050 m3 Koral Beton

120.000,00 132.000,00 6.000,00 6.600,00



1,500 Lbr Seng Gelombang BJLS 32
63.500,00 69.850,00 95.250,00 104.775,00















6.6.2

Tenaga



101.875,00 112.062,50



2,000 OH Tukang Kayu

35.000,00 38.500,00 70.000,00 77.000,00



1,000 OH Pekerja

22.500,00 24.750,00 22.500,00 24.750,00



0,200 OH Kepala Tukang

37.500,00 41.250,00 7.500,00 8.250,00



0,050 OH Mandor

37.500,00 41.250,00 1.875,00 2.062,50















6,7 1,000 m2 Pembuatan Rumah Jaga / Konstruksi Kayu

1.083.910,00 1.192.301,00


6.7.1

Bahan



1.001.410,00 1.101.551,00



3,000 Btg Kayu Dolken diameter 8 - 10 / 400 cm 35.200,00 38.720,00 105.600,00 116.160,00



0,276 m3 Kayu Kalimantan

2.860.000,00 3.146.000,00 789.360,00 868.296,00



0,700 Kg Paku Biasa 2" - 5"
16.000,00 17.600,00 11.200,00 12.320,00



1,500 Lbr Seng Gelombang BJLS 32
63.500,00 69.850,00 95.250,00 104.775,00















6.7.2

Tenaga



82.500,00 90.750,00



1,500 OH Tukang Kayu

35.000,00 38.500,00 52.500,00 57.750,00



1,000 OH Pekerja

22.500,00 24.750,00 22.500,00 24.750,00



0,150 OH Kepala Tukang

37.500,00 41.250,00 5.625,00 6.187,50



0,050 OH Mandor

37.500,00 41.250,00 1.875,00 2.062,50















6,8 1,000 m2 Membersihkan Lapangan dan Perataan

3.300,00 3.630,00


6.8.2

Tenaga



3.300,00 3.630,00



0,100 OH Pekerja

22.500,00 24.750,00 2.250,00 2.475,00



0,050 OH Mandor

37.500,00 41.250,00 1.875,00 2.062,50















6,9 1,000 m2 Pembuatan Bedeng Buruh


567.795,00 624.574,50


6.9.1

Bahan



465.920,00 512.512,00



1,250 Btg Kayu Dolken diameter 8 - 10 / 400 cm 35.200,00 38.720,00 44.000,00 48.400,00



0,186 m3 Kayu
0,300 Kg Paku Biasa 2" - 5" 16.000,00 17.600,00 4.800,00 5.280,00
18,000 Kg Portland Cement 1.020,00 1.122,00 18.360,00 20.196,00
0,030 m3 Pasir Beton 120.000,00 132.000,00 3.600,00 3.960,00
0,050 m3 Koral Beton 120.000,00 132.000,00 6.000,00 6.600,00
1,500 Lbr Seng Gelombang BJLS 32 63.500,00 69.850,00 95.250,00 104.775,00
1,350 Lbr Plywood 4 mm 51.000,00 56.100,00 68.850,00 75.735,00

6.9.2 Tenaga
101.875,00 112.062,50
2,000 OH Tukang Kayu 35.000,00 38.500,00 70.000,00 77.000,00
1,000 OH Pekerja 22.500,00 24.750,00 22.500,00 24.750,00
0,200 OH Kepala Tukang 37.500,00 41.250,00 7.500,00 8.250,00
0,050 OH Mandor 37.500,00 41.250,00 1.875,00 2.062,50

6.10 1,000 m2 Pembuatan bak Adukan Uk.40 x 50 x 20 cm
95.804,20 105.384,62
6.10.1 Bahan
57.960,00 63.756,00
0,036 m3 Kayu Terentang 1.210.000,00 1.331.000,00 43.560,00 47.916,00
0,080 Kg Paku Biasa 2" - 5" 16.000,00 17.600,00 1.280,00 1.408,00
1,000 Btg Kaso 5/7 Kayu bangkirai 33.600,00 36.960,00 33.600,00 36.960,00

6.10.2 Tenaga
37.844,20 41.628,62
0,300 OH Tukang Kayu 35.000,00 38.500,00 10.500,00 11.550,00
0,002 OH Mandor 37.500,00 41.250,00 56,25 61,88

6,11 1,000 m2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm
23.761,25 26.137,38
6.11.1 Bahan
12.062,50 13.268,75
1,000 Btg Bambu diameter 6 - 8 / 600 cm 11.000,00 12.100,00 11.000,00 12.100,00
0,250 Kg Tali Ijuk 4.250,00 4.675,00 1.062,50 1.168,75

6.11.2 Tenaga
11.698,75 12.868,63
0,170 OH Tukang Kayu 35.000,00 38.500,00 5.950,00 6.545,00
0,250 OH Pekerja 22.500,00 24.750,00 5.625,00 6.187,50
0,002 OH Kepala Tukang 37.500,00 41.250,00 75,00 82,50
0,001 OH Mandor 37.500,00 41.250,00 48,75 53,63

6,12 1,000 m2 Pembuatan Jalan Sementara
57.375,00 63.112,50
6.12.1 Bahan
33.000,00 36.300,00
0,150 m3 Batu Belah 15/20 cm 130.000,00 143.000,00 19.500,00 21.450,00
0,090 m3 Batu Pecah 5/7 cm 140.000,00 154.000,00 12.600,00 13.860,00
0,010 m3 Pasir Pasang 90.000,00 99.000,00 900,00 990,00

6.12.2 Tenaga
24.375,00 26.812,50
1,000 OH Pekerja 22.500,00 24.750,00 22.500,00 24.750,00
0,050 OH Mandor 37.500,00 41.250,00 1.875,00 2.062,50

6,13 1,000 m3 Bongkaran Beton Bertulang
162.495,00 178.744,50
6.13.2 Tenaga
162.495,00 178.744,50
6,667 OH Pekerja 22.500,00 24.750,00 150.007,50 165.008,25
0,333 OH Mandor 37.500,00 41.250,00 12.487,50 13.736,25

6,14 1,000 m3 Bongkaran Dinding Tembok Bata Merah
16.245,00 17.869,50
6.14.2 Tenaga
16.245,00 17.869,50
0,667 OH Pekerja 22.500,00 24.750,00 15.007,50 16.508,25
0,033 OH Mandor 37.500,00 41.250,00 1.237,50 1.361,25

6,15 1,000 m' Pasang Pagar Kawat Jaring Galvanis Tinggi 1 m
10.570,50 11.627,55
6.15.1 Bahan
7.920,50 8.712,55
0,434 Lbr Pagar Kawat Jaring 18.250,00 20.075,00 7.920,50 8.712,55

6.15.2 Tenaga
2.650,00 2.915,00
0,042 OH Tukang 35.000,00 38.500,00 1.470,00 1.617,00
0,042 OH Pekerja 22.500,00 24.750,00 945,00 1.039,50
0,004 OH Kepala Tukang 40.000,00 44.000,00 160,00 176,00
0,002 OH Mandor 37.500,00 41.250,00 75,00 82,50

6 PEKERJAAN TANAH

6,1 1,000 m3 Galian Tanah Biasa Sedalam 1 m
- 8.560,00 9.416,00
Tenaga
- 8.560,00 9.416,00
0,700 OH Pekerja 22.500,00 24.750,00 15.750,00 17.325,00
0,025 OH Mandor 37.500,00 41.250,00 937,50 1.031,25

6,2 1,000 m3 Galian Tanah Biasa Sedalam 2 m
11.239,00 12.362,90
Tenaga
11.239,00 12.362,90
0,900 OH Pekerja 22.500,00 24.750,00 20.250,00 22.275,00
0,045 OH Mandor 37.500,00 41.250,00 1.687,50 1.856,25

6,3 1,000 m3 Galian Tanah Biasa Sedalam 3 m
15.714,50 17.285,95
Tenaga
15.714,50 17.285,95
1,050 OH Pekerja 22.500,00 24.750,00 23.625,00 25.987,50
0,067 OH Mandor 37.500,00 41.250,00 2.512,50 2.763,75

6,4 1,000 m3 Galian Tanah Keras Sedalam 1 m
13.360,50 14.696,55
Tenaga
13.360,50 14.696,55
1,000 OH Pekerja 22.500,00 24.750,00 22.500,00 24.750,00
0,032 OH Mandor 37.500,00 41.250,00 1.200,00 1.320,00

6,5 1,000 m3 Galian Tanah Cadas Sedalam 1 m
26.750,00 29.425,00
Tenaga
26.750,00 29.425,00
1,500 OH Pekerja 22.500,00 24.750,00 33.750,00 37.125,00
0,060 OH Mandor 37.500,00 41.250,00 2.250,00 2.475,00

6,6 1,000 m3 Galian Tanah Lumpur Sedalam 1 m
17.632,50 19.395,75
Tenaga
17.632,50 19.395,75
1,200 OH Pekerja 22.500,00 24.750,00 27.000,00 29.700,00
0,045 OH Mandor 37.500,00 41.250,00 1.687,50 1.856,25

6,7 1,000 m2 Pekerjaan Striping Setinggi 1 m
1.070,00 1.177,00
Tenaga
1.070,00 1.177,00
0,050 OH Pekerja 22.500,00 24.750,00 1.125,00 1.237,50
0,005 OH Mandor 37.500,00 41.250,00 187,50 206,25

6,8 1,000 m3 Pembuangan Tanah Sejauh 15 m
10.996,00 12.095,60
Tenaga
10.996,00 12.095,60
0,516 OH Pekerja 22.500,00 24.750,00 11.610,00 12.771,00
0,050 OH Mandor 37.500,00 41.250,00 1.875,00 2.062,50

6,8 1,000 m3 Pembuangan Tanah Sejauh 30 m
10.996,00 12.095,60
Tenaga
10.996,00 12.095,60
0,330 OH Pekerja 22.500,00 24.750,00 7.425,00 8.167,50
0,010 OH Mandor 37.500,00 41.250,00 375,00 412,50

6,9 1,000 m3 Urugan Kembali
4.103,00 4.513,30
Tenaga
4.103,00 4.513,30
0,192 OH Pekerja 22.500,00 24.750,00 4.320,00 4.752,00
0,019 OH Mandor 37.500,00 41.250,00 712,50 783,75

6.10 1,000 m3 Pemadatan Tanah (per 20 cm)
10.700,00 11.770,00
Tenaga
10.700,00 11.770,00
0,500 OH Pekerja 22.500,00 24.750,00 11.250,00 12.375,00
0,050 OH Mandor 37.500,00 41.250,00 1.875,00 2.062,50



1.210.000,00 1.331.000,00 225.060,00 247.566,00